Mass Foam Systems installed cavity wall insulation at North Hertfordshire Leisure Centre to help reduce heat loss through the building’s external walls.
The project
The leisure centre wanted to improve the building’s thermal performance and support its energy-efficiency objectives. Mass Foam Systems assessed the existing insulation and identified cavity wall insulation as a suitable improvement.
The work
The team installed insulating material within the cavity walls to reduce heat escaping through the building envelope. Work was coordinated with the leisure centre’s management to minimise disruption to its operations.
The intended benefit
The installation was designed to improve thermal performance and reduce demand on the heating system, supporting the leisure centre’s energy-efficiency objectives.
Discuss insulation for your building
Learn about cavity wall insulation or request a call back to discuss your building with Mass Foam Systems.
